Commissioning; Maintenance - Wilo Star-Z 20/1 Instrucciones De Instalación Y Funcionamiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 32

6. Commissioning

6.1 System filling and venting
Ensure that the pipe system is
properly filled. The pump vents itself
automatically after a short operational
period. Short-term dry-running will not
harm the pump. If necessary, the
pump can be directly vented in ac-
cordance with the following procedure:
– Switch-off pump,
– close discharge isolating valve,
– Carefully slacken and remove the
central access plug using screw-
driver (Fig. 3).
– Depending on liquid tempe-
rature and system pressure,
hot liquid or vapour can be
releases when undoing the
central access plug.
Beware!
Danger of scalding!
– Protect electrical parts from leaking
water,
– switch-on pump again,
– after 15 ... 30 secs close access
plug again,
– open isolating valve again.
ATTENTION!
It is possible that the pump shaft jams
with the access plug open, depending
on system pressure.
– The pump can become
extremely hot, depending
on the operating state of
pump or pipe system (fluid
temperature).
Beware of scalding when
touching the pump!
6.2 Pre-Start Adjustments
– Direction of rotation check on
3-phase motors:
Remove central access plug at the
non-drive end of the motor. Briefly
switch on motor and check
whether sense of rotation corre-
sponds to the arrow on the name
plate; if necessary, change any two
phase wires.

7. Maintenance

Prior maintenance or repair
work switch off the pump and
secure against unauthorized
switching.
ENGLISH
13
Tabla de contenido
loading

Este manual también es adecuado para:

Star-z 25/2Star-z 25/2 dmStar-z 25/6Star-zd 25/6

Tabla de contenido