Hach TU5300 sc Manual Básico Del Usuario página 18

Ocultar thumbs Ver también para TU5300 sc:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 53
6
• Tubing
• Tubing cutter
1. Plumb the instrument. Refer to the illustrated steps that follow and
Note: To plumb the instrument with accessories, refer to the documentation supplied with the accessories.
2. If a service bracket is not installed near the instrument, do the steps that follow:
a. Do not do illustrated steps 1 and 2.
b. Do illustrated steps 3 and 4 with the process head on the instrument.
c. Before step 5, remove the process head from the instrument.
d. Hold the process head so that it is not above the instrument or put the process head on the
optional process head holder.
e. Do illustrated steps 5 and 6.
f. When there are no leaks from the process head or the flow regulator, install the process head
on the instrument (illustrated step 8).
Figure 6 Plumbing overview – no accessories
1 Service bracket
2 Sample inlet
3 Sample outlet
6
Refer to
Specifications
18 English
on page 3 for the tubing requirements.
Figure
4 Flow regulator
5 Flow shutoff valve
6.
Tabla de contenido
loading

Este manual también es adecuado para:

Tu5400 sc

Tabla de contenido