T-ONE EXPORT 155 & 180
Any part:
- That has been permanently distorted
- That has been drilled.
- That has been notched (by grinding for example...)
- That is very rusty.
... must be discarded!
Replace the component whenever you are in doubt.
MAINTENANCE
Keep parts clean and safety devices in good running order.
Replace or clean any plates or stickers that provide information on how to use the unit or on safety.
Check:
Statutory checks (stipulated in the order of December 21, 2004) are as follows:
A check must be made on every worksite before the unit is put into use:
- For the first time,
- After the scaffolding has been dismantled and re-assembled.
- After any modifications in the scaffolding's conditions of use, or in weather or environmental conditions
that are liable to affect its safety when used.
- Whenever the scaffolding has not been used for at least one month.
This check must include appropriateness testing, an assembly and installation check and a working
condition check. Traceability of this check will be formalized on the establishment's safety register.
Daily checks
This includes a check on working order.
Traceability of this check is formalized by a sheet attached to the access hatch.
Quarterly checks
In the case of mobile scaffolding, this check covers the same points as the daily check. The check is to be
made at least once every three months and must be formalized on the establishment's safety register.
N.B.: These checks may only be carried out by personnel holding a qualification certificate issued by the
head of the establishment bearing the words "Controller and user".
For more information and details concerning control checklists, see RECO R.457, appendix 3, 3bis, 4, 5 and
6.
Page 22 of 24