TotalPond 52549 Manual Del Usuario página 5

Ocultar thumbs Ver también para 52549:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

OPERATION INSTRUCTIONS
The instructions will show a pond installation and a block wall. First
complete Assembling the Lighted Spillway then proceed to
Installation steps.
Assembling the Lighted
Spillway
Step 1. For maximum water flow, it is
recommended that the largest tubing
size for your pump is used. If needed,
cut the adapter as shown using a
hacksaw; consult packaging for tubing
size.
Step 2. There are two inlets on the
spillway. First option is the preferred
installation method, but option 2 may be
used based on install.
Attach the adapter to the spillway first,
then slip the hose clamp onto the tubing
but do not tighten it. Connect tubing to the
adapter.
NOTE: The spillway has two outlets to
install the adapter. Place the cap and
gasket on the outlet not being used.
NOTE: Tubing is NOT INCLUDED.
Step 3. Tighten the hose clamp using a
flathead screwdriver.
For installation in a pond
Step 1. Select a level location to place the
waterfall spillway. Begin by building a base with
the desired waterfall height.
Step 2. Place the spillway onto the base.
NOTE: It is very important that the spillway
is level, so be sure to check that the
structure is level from front to back as well
as left to right.
Step 3. Connect the other end of the
tubing to the pump. Place the pump in the
pond.
NOTE: Tubing and pump are not included.
2
option 1
cap
Adapter
hose
Tubing
clamp
option 2
Adapter
cap
hose clamp
Tubing
3
1
2
3
1
3
Tabla de contenido
loading

Tabla de contenido