Appendix B1 - Pfannenberg EB 2.0 Serie Libro De Instrucciones

Ocultar thumbs Ver también para EB 2.0 Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75

APPENDIX B1

Maintanace / Check and Inspections
CAUTION!
Before any maintenance intervention, not needing the machine running, disconnect the supply voltage
and put the signal MAINTENANCE IN PROGRESS next to the lockable main switch in "Off" position.
Carrying out the tests and check program listed below will extend the life of the equipment and avoid possible breakdowns.
Please Note: it is of utmost importance the compliance with Regulation (UE) No 517/2014, regarding mandatory regular leakage-
check program, as described in Section 2 of this Operation and Maintenance Manual.
Check mechanical working of the compressor . Control the absence of metallic vibrations and not too high noises and
temperatures on the compressor head during running to verify its regular working.
Check the operation of the fan.
Check the electrical alarm systems and controls.
Check the filling of the tank (visual level). If the system is filled with a glycol-mix, refill only with the same mix. Only water will
reduce the concentration of glycol.
Check that pressure, flow rate and temperature values of the hydraulic circuit are included into the limits indicated on the
machine label.
If the chiller is equipped with an air filter, the filter has to be changed/cleaned monthly, or, if required in a shorter time interval
70040-106_01-E_EN-DE-IT-ES-FR-RU.docx
English
Picture 21 – Compressor placement
Picture 22 – Fan placement
19
Tabla de contenido
loading

Tabla de contenido