Window Requirements; Prepare The Air Conditioner - GE AEN05 Manual Del Propietario Y Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

WINDOW REQUIREMENTS

1
• These instructions are for a standard
double-hung window. You will need to
modify them for other types of windows.
• The air conditioner can be installed
without the accordion panels if needed
to fit in a narrow window. See the
window opening dimensions.
• All supporting parts must be secured
to firm wood, masonry or metal.
• The electrical outlet must be within
reach of the power cord.
22" to 38"
(With accordion panels)
18
1
(Without accordion panels)
All manuals and user guides at all-guides.com
Installation Instructions
" min.
13
1
4
" min.
4
STORM WINDOW REQUIREMENTS
2
A storm window frame will not allow the
air conditioner to tilt toward the outside,
and will keep it from draining properly.
To adjust for this, attach a piece of wood
to the stool.
WOOD PIECES–
WIDTH: 2"
LENGTH: Long enough to fit inside the
window frame.
THICKNESS: To determine the thickness,
place a piece of wood on the stool to
make it 1/2" higher than the top of the
storm window frame.
Attach securely with nails or screws
provided by the installer.
1/2" higher
than frame
Storm
window
frame

PREPARE THE AIR CONDITIONER

3
Install the top mounting rail with 2 Type B
A
screws from the outside of the case.
Top mounting rail
Bottom mounting rail
B
Slide the left and right accordion panels
into the top and bottom mounting rails.
Top left
10
Wood
Stool
Top right

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ael05

Tabla de contenido