4. For ease of carrying during the location
survey, attach the installation handle to
the back of the device with a Phillips-head
screwdriver.
5. Unscrew the PoE gland cap and insert one
end of the installation PoE cable.
NOTE: This is for location survey purposes
only. You will install the permanent PoE
cable later. Set aside the bushing and cap.
6. Insert the other end of the cable into the
PoE injector Data & Power Out port. Plug
the PoE injector into an earthed AC outlet.
Location Survey
1. Scan the QR code to download the
Inseego Mobile App from Apple
Store or Google Play
https://inseego.com/inseego-
connect-get-app
2. Follow instructions within the Inseego
Mobile App to connect to the FW2000e and
perform a 5G site survey to identify the ideal
location to install.
Store, or visit
to download the App.
English