Operation
2. Now press the SET button 6 . The Watt symbol 8
3. Press the UP 5 or DOWN button 4 to select either
4. Press the SET button 6 . The first digit flashes.
5. Press the UP 5 or DOWN button 4 to set the
6. Press the SET button 6 to move to the next digit.
7. Repeat steps 5 and 6 until you have set the required
8. When you have set the value for the last digit, press the
note: as soon as the entered overload warning values are
exceeded by any connected electrical appliance you are testing,
the overload symbol 7 flashes and a warning signal sounds.
q
i
50 GB
Energiekostenmessgeraet_Content_PM240S_1.indd 50
begins to flash.
the overload warning value for power consumption (W)
8 or the overload warning value for current (A) 9 .
required value.
overload warning value.
PRICE button 3 to confirm your entry.
Measure mains voltage
Press the DOWN button 4 until the Volt symbol 10
appears in the centre of the LCD display 2 .
note: the "Measure mains voltage" function is the stand-
ard setting for the wattmeter. As soon as the isolating strip
09.03.09 12:53