Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING THE
INSTRUCTIONS BELOW:
Let each group dispense water for about a minute.
Continuously dispense hot water (pressing the appropriate button) until at least 6 liters of water have been used for a ma-
chine with 2 groups (see the "Cleaning and Maintenance" Chapter in the User's Manual).
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
23