noken SMART LINE 100210496_N386000067 Instrucciones De Instalación página 12

Assembly of the cistern
Refer to these instructions where applicable if unassembled or if a pre-assembled
unit requires the inlet valve on the opposite side to pre assembly.
If PRE-ASSEMBLED
Before beginning installation consider which
1.
side the inlet valve should be positioned.
2. Position the valve inside the tank
ensuring internal seal washer (1)
is on the threaded shank first.
Push down on the valve body and
tighten up lock nut.
The cable (3) and overflow (2) should be
positioned the opposite side to the
valve see picture opposite.
Note the position of the overflow is
important to the operation dependant
on which side the inlet is positioned
Side inlet valve installation
Assemble the valve as shown
in the diagram.
Note: An extra back nut is provided
so that the length of exposed
thread can be reduced when fitting
into units 500mm wide using the
elbow provided.
A blanking plug is supplied to
blank the opposite side inlet
hole of the cistern tank.
12
1
2
3
Inlet Valve
Inner
Washer
Washer
(Not Supplied)
Back
Nut
Outer
Washer
Tap
Connector
(Not Supplied)
Supply Line
3
2
2
3
Inlet Valve
Float
Cap
Adjustment Rod
Assembly
Shank
Coupling
Nut
Float Cup
loading