Initial Inspection; Hardware Installation - Nexxt Solutions X4YHADSW100 Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Initial inspection

Before installing the electrical xture, ensure that all parts
are included in the package. If any part is missing or
damaged, do not attempt to assemble, install, or operate
this product.
Estimated installation time: about 30 minutes.
Tools that may be required but are not included for
installation
1. Phillips screwdriver
2. Flathead screwdriver
3. Pliers
4. Wire strippers/cutters
5. Circuit tester
6. Work gloves
7. Electrical tape
8. Safety goggles
1
2
3
4
5
6
7
8

Hardware installation

IMPORTANT
For safety, properly ground the dimmer switch
Always follow the code standards when installing wired
connections.
Step 1
Shut power off at the breaker
Find the breaker that controls the circuit for the junction
box where the smart dimmer switch will be installed. Turn it
to the OFF position.
Place tape over the circuit breaker switch and verify that
power is o .
Note: you can use the circuit tester at this point to verity
that power is cut o .
ON
OFF
ON
OFF
ON
OFF
Tabla de contenido
loading

Tabla de contenido