Barrette 73040779 Manual De Instrucciones página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

6.
Locate where to pre-drill a hole through the post
and rail (Fig. 4). Pilot holes for screws should be
located directly at the intersection of the small
groove of the post and the channels. Using
the 1/8" drill bit provided, pre-drill pilot hole as
indicated above.
Then, using the #2 square drive bit provided in
the kit, secure screw into both posts, securing
posts and rails together. (Fig. 5). Remove 3"
spacer blocks.
Predrill - Line
Predrill - Line
7.
Install screen by sliding down the channels
on either side of the posts (Fig. 6) and into the
channel of the bottom rail.
NOTE:
The screen will be loose in the posts and
the bottom rail. This is designed to allow
the screen to expand and contract during
heating and cooling of the day.
8.
Slide H-Channel in the groove from the top,
resting it on the top of the Decorative Screen
Panel. Lift H-Channel about 1/8" (to allow for
expansion and contraction), then pre-drill a hole
following same process in Step 6. Screw should
be installed directly on the small groove of the
post, connecting with the H-channel. (Fig. 7).
4
Predrill - Corner
Predrill - Corner
Predrill - Corner
Predrill - Corner
Predrill - Corner
Screw
Screw
Predrill - End
Predrill - End
Fig. 4
Fig. 5
Fig. 6
Fig. 7
Tabla de contenido
loading

Tabla de contenido