Barrette 73040779 Manual De Instrucciones página 3

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1.
Determine where you would like to install the
frame kit. Make sure the posts will be held in
place by a solid structure and if necessary,
reinforce the surface it is attaching to.
2.
Install base plates to bottom of posts. Locate
bottom post with pre-tapped holes and attach
the bottom plate to that end. Using a #3 Phillips
drive bit, screw base plate to bottom of post
through the (4) screw bosses (Fig. 1). Posts are
partially threaded on one end of the post (3/4").
While installing screws, you will feel resistance at
the 3/4" mark for a tighter, more secure t. Install
screws until they're ush with the plate (Fig. 2).
TIP:
Drill should be set to low speed when securing
plates to post.
3.
Set rst post in desired location. Use the post
assembly to mark the holes for the surface
mounting plate. Mark and drill holes for
appropriate 3/8" fasteners (fasteners will vary
depending on mounting surface).
Attach post/base assembly to surface using
appropriate 3/8" fasteners.
NOTE:
Keep in mind ceiling clearance if installing
inside. Attaching post/base assembly
to surface may need to wait until end of
installation if full assembly must be tilted for
all 3 panels to be installed properly.
4.
Place two 3" spacer blocks to support bottom
rail. Take bottom rail and insert into channel or
rst post, resting on the 3" spacer blocks (Fig. 3).
NOTE:
This step is to set distance in between posts.
5.
Take second post and insert opposite side of
bottom rail into the channel of this post. Be sure
rail is fully inserted into the post. Lock second
post into position by repeating Step 3.
NOTE:
If connecting more than one frame kit
together, line or corner posts are available
(sold separately).
2-1/2"
3/4"
Screw head
should be ush
to the base of
the plate
Fig. 1
Fig. 2
Post
1/4-20
Screw
Pre-threaded
section of
post
Base Plate
Fig. 3
Spacer
Spacer
Block
Block
3
Tabla de contenido
loading

Tabla de contenido