INSTALLATION INSTRUCTIONS FOR SINGLE UNIT (cont.)
WARNING
These appliances are top heavy, especially with any
doors open, and must be secured to prevent tipping
forward which could result in death or serious injury.
Read and follow the entire installation instructions for
securing the appliance with the anti-tip system.
BRACKET
Mark (within slots, placement) stud and anchor
positions on brackets.
Slot
Secure bracket using a combination of studs &
anchors.
At least 1 stud must be engaged. However, please
engage as many studs as possible within the
enclosure. A minimum of three fasteners should be
used for proper installation.
Installation Instructions
Tip Over Hazard.
80"
STEP 3 CONNECT WATER LINE
Connect to potable water supply
WARNING
only.
Position appliance in front of enclosure.
Locate and bring tubing to the front of the cabinet.
Turn the water on to flush debris from line. Run about
shut off water.
If needed cut the tubing to the proper length so it can
be attached to the water valve.
Copper Tubing:
copper tubing. Insert tube into the union fitting on the
unit and tighten nut to union.
Turn on the water to check for leaks.
SmartConnect™ Tubing:
Follow the instructions provided with the tubing. Over
tightening may cause leaks. Turn on the water to
check for leaks.
NOTE: Coil excess tubing length behind the unit.
STEP 4 CONNECT POWER
Plug the power cord into the socket.
Check to make sure power to unit is on by opening
the ice drawer (FF door will be banded or taped shut)
to see if interior lights are on.
The temperature controls are preset at 37°F for the
refrigerator section and 0°F in both the freezer drawer
and customizable drawer.
Allow 24 hours to stabilize before making
adjustments.
14
Water
Line Hole
31-1000169 Rev. 4