Commissioning - Samil Power SolarRiver 3400TL-D Manual Del Usuario

Ocultar thumbs Ver también para SolarRiver 3400TL-D:
Tabla de contenido
SamilPower Co., LTD.
S/N:
987654000
Master DSP SW:
V1.83
Slave DSP SW:
V1.83
HCI MCU SW:
V1.10
Press OK to start commissioning.
Language
English
German
French
Spanish
Italian
Press OK to confi rm.
Country
DE - VDE 4105
CZ - EN 50438
IT - CEI 0-21
GR - Islands
AU - AS 4777
GR - Continent
ES - RD 1699
NL - EN 50438
Current Country:
DE - VDE 4105
Press OK to confi rm
After connecting to AC and DC
power the inverter presents the
screen on the left.
Press OK to start

commissioning.

Select the language.
Press OK to confi rm.
Select the country.
Press OK to confi rm.
SR3_4-6_0TLD-IG_10_EU
Date/Time
YYYY
MM
2 0 1 4
-
0 1
hh
mm
0 0
:
0 0
Left/Right: Move selection
Up/Down: Increase/Decrease Value
Press OK to confi rm.
End Commissioning
Current Country:
DE - VDE 4105
Press OK to start running
Press ESC to back
Press OK to confi rm.
11-04-13 10:12:17
Home
Power
10.0 kWh (%)
100
Current
80
60
Today
40
20
Total
t
0
06
12
18
24
Normal
299.1
V
229.5
297.9
V
49.99
Press Esc to Main Menu
40
Commissioning
Specify Date and Time.
- - -
Press OK to confi rm.
DD
-
1 5
End of Commissioning:
Press OK to confi rm.
The inverter performs self-tests
and checks the AC-grid.
1218.9
W
The inverter starts operation after
a few minutes.
kWh
0.01
kWh
4.10
See page 22 for changing the
settings.
V
Hz
EN
Tabla de contenido
loading

Tabla de contenido