Fanimation SLINGER v2 Manual De Instrucciones página 8

Ocultar thumbs Ver también para SLINGER v2:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

How to Assemble Your Ceiling Fan (continued)
6. Reinstall the hanger ball on the downrod as follows.
Route the black and white wires through the hanger
ball. Position the pin through the two holes in the
downrod and align the hanger ball so the pin is
captured in the groove in the top of the hanger ball.
Pull the hanger ball up tight against the pin. Securely
tighten the set screw in the hanger ball. A loose set
screw could create fan wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the top of the downrod. Strip insulation off
1/2 inch from the end of each lead wire. (Figure 7)
NOTE: All set screws must be checked, and retightened
where necessary, before installation.
8
Figure 6
Figure 7

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Lp8147slbn

Tabla de contenido