Pentair Flotec FPDC 30 Manual De Instalación Y Funcionamiento página 7

Sistemas de batería auxiliar
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION
NOTE: Check valve flapper(s) must swing AWAY and flow arrow(s) must point AWAY from pump being protected.
* The water level when the switch shuts off must be above the BBU pump intake.
FP979 (06-08-20)
* Supplied with the Battery Backup System.
Items in italics must be purchased separately
Not to scale.
Wiring omitted for clarity.
Slope DOWN
to outlet
1-1/2" PVC Upper
Discharge Pipe
(cut to t)
U74-68 Hose and
Clamp Assembly
(Purchase Separately)
1-1/2" PVC Riser Pipe
(cut to t)
Flow Arrow; Must point
AWAY from Pump
being Protected
FP0026-10
Check Valve
(Purchase
Separately)
Lower Discharge Pipe
1-1/2" PVC Pipe
(cut to t)
Battery Backup
Switch*
Drill 1/8" Anti-Airlock
Hole
1-1/4" FNPTx1-1/2" Slip
Elbow*
PTFE pipe thread
sealant tape on all
threaded joints
Battery Back Up
Sump Pump*
Figure 2: Separate Discharge - Typical Installation
Sill
Floor
Joist
If the sump is small,
hang the BBU from
the Primary discharge
pipe on an angle bracket.
Primary Sump Pump
Check Valve
6782 0313a
7
Tabla de contenido
loading

Tabla de contenido