NGP SLAL-75-BP Instrucciones De Instalación

Herrajex para puertas corredizas colgantes
Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

Track
(2) Front Hangers
(2) Back Hangers
(2) Brass Pulls
(2) Chrome Pulls with Steel Bracket
#8 x 5/8" PH SMS
#8 x 1-3/8" PH SMS
1-3/8" (34.9mm)
Doors
(B)
Side Mount Selection Chart
Door Thickness
Front Hanger
(B) Deep Offset
Back Hanger
(A) Thin Offset
Door Gap
INSTALLATION INSTRUCTIONS
B
-P
y
ass
1-1/4" min.
1-9/16" max.
(A)
3/4"
1"
A
B
5/16"
3/4"
s
d
liding
oor
slal-75-BP
1. Prepare Opening
Opening Height Max = Door Height + 2-1/16"
Opening Height Min = Door Height + 1-3/4"
(A)
1-1/8"
1-3/8"
A
A
B
B
5/8"
3/8"
H
ardware
3/4" (19.05mm)
Doors
1-1/4" min.
1-9/16" max.
(B)
2.20
loading

Resumen de contenidos para NGP SLAL-75-BP

  • Página 1 INSTALLATION INSTRUCTIONS liding ardware slal-75-BP Track 1. Prepare Opening Opening Height Max = Door Height + 2-1/16" (2) Front Hangers Opening Height Min = Door Height + 1-3/4" (2) Back Hangers (2) Brass Pulls (2) Chrome Pulls with Steel Bracket #8 x 5/8"...
  • Página 2 2. Install Track and Hangers • Center track in opening and secure with (#8x1-3/8") screws • Center first drill hole 1/2" from edge of door • Secure hangers onto door with (#8x5/8") screws 3. Hang Doors • Mount rear door first by tilting door back and resting carrier wheels on rear rail •...
  • Página 3 INSTRUCCIONES DE INSTALACION errajex uertas orredizas olgantes lal-75-BP 1. Prepare la Apertura Riel Altura Máxima de la Apertura = Altura de la Puerta + 2-1/16" (2) Correderas Frontales Altura Mínima de la Apertura = Altura de la Puerta + 1-3/4" (2) Correderas Posteriores (2) Jaladeras de Latón (2) Jaladeras de Cromo con...
  • Página 4 2. Instalación del Riel y las Correderas • Centre el riel en la apertura y asegúrelo con tornillos (#8 x 1-3/8") • Taladre el primer orificio centrándolo 1/2" del borde de la puerta • Asegure las correderas en la puerta con tornillos (#8 x 5/8") 3.