LG MULTI V SYNC II ARUB Serie Manual De Instalación página 23

Ocultar thumbs Ver también para MULTI V SYNC II ARUB Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Foundation for Installation
• Fix the unit tightly with bolts as shown below so that unit will not fall down due to earthquake or gust.
• Use the H-beam support as a base support
• Noise and vibration may occur from the floor or wall since vibration is transferred through the installation
part depending on installation status. Thus, use anti-vibration materials (cushion pad) fully (The base pad
shall be more than 200mm).
G
WARNING
• Be sure to install unit in a place strong enough to withstand its weight.
Any lack of strength may cause unit to fall down, resulting in a personal injury.
• Have installation work in order to protect against a strong wind and earthquake. Any installation
deficiency may cause unit to fall down, resulting in a personal injury.
• Especially take care for support strength of the floor surface, water drain processing (processing of
water flown out from the outdoor unit during operation) and paths of the pipe and wiring when mak-
ing a base support.
• Don't use a tube or pipe for water drain in the base pan and perform water drain processing by
using the drain path. Water drain may not be done due to freezing of a tube or pipe.
Ensure that the corner part can be securely mounted. Otherwise, the support for
A
installation may be bent.
B
Obtain and use the M10 anchor bolt.
C
The corner was not properly mounted.
D
Outdoor unit (Insert the cushion pad between outdoor unit and base support to ensure that
anti-vibration may be done in a wide area)
E
Pipe and wiring space (in case of piping and wiring on the floor surface)
H-Beam support
F
Concrete base support
G
Rear view
Installation
Side view
Water
Drain
Path
Installation Manual 23
Tabla de contenido
loading

Tabla de contenido