Scope Of Delivery - Blumfeldt Greenkeeper Solar Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

EN
10

SCOPE OF DELIVERY

Solar panel and
control unit
1x
Four-piece
coupling
20x
INSTALLATION
1
Cut the thick hose according to the depth of the water container and
insert the filter into the hose.
2
Insert the other end of the hose into the inlet of the control unit.
3
Cut another piece of thick hose according to the distance between the
control unit and the first plant. Attach the Y-shaped four-piece coupling to
the end of the hose.
4
Then cut the thick and thin tubes according to the distances between the
plants. Use the hose connections to connect all the potted plants. Connect
one end of the tube to a drip and insert the drip into the potting soil. If the
plant is very large, use more than one dripper to get enough water.
5
Finally, insert the hose plugs into the open hose ends.
Hose (7/9)
Hose (4/6)
18 m
12 m
Dropper
Hose plug
40x
Y-shaped four-
piece coupling
1x
Filter
3x
1x
Tabla de contenido
loading

Este manual también es adecuado para:

100034626

Tabla de contenido