Open the leading Edge air intake velcro to access the valve.
6
repeat process for the other side.
10
7
Connect the two ISL lines coming out of the kite to the LSL line, using a loop-to-loop connection.
pull the valve out.
8
Ensure the connected lsl and isl lines pass between all
bridles and the speed systems.
11
roll the valve up, and secure in place with the four velcro
retainers. make sure you properly roll the valves, do not
bunch them up.
9
12
15