Husky 72WB01SS-THD Manual Del Operador página 3

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLY
SIDE CONSTRUCTION
Items Needed:
A - Side (Qty: 2)
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 4)
BB - 5/16in Washer (Qty: 4)
CC - 1/4-20 Flange Nut (Qty: 4)
EE - Screw Leveler (Qty: 4)
FF - Leveling Foot, Left (Qty: 2)
GG - Leveling Foot, Right (Qty: 2)
Process:
• Place (1) leveling foot pad FF and (1) leveling foot pad
GG on each side at the bottom. Make sure each leveling
foot is fully seated on each corner.
• Secure each Leveling Foot with (1) bolt AA, (1) Washer
BB and (1) Nut CC.
• Wrench tighten.
• Assemble (1) leveler EE in each leveling foot. Some
adjustments may be necessary after workbench is in
desired position.
Figure 1
TOP RAIL ASSEMBLY
Items Needed:
B - Rail - Top Back (Qty: 1)
D - Rail - Top Front (Qty: 1)
AA - 1/4-20 x 5/8in Carriage Bolt (Qty: 8)
BB - 5/16 Washer (Qty: 8)
CC - 1/4-20 Serrated Flange Nut (Qty: 8)
Process:
• Place Workbench Top, with stainless steel side facing
down. (Use packaging material to prevent scratches.)
NOTE: The Rail with the Husky® nameplate should be
placed toward the front of the unit with the nameplate
position upside down.
• Assemble (2) sides A and rails B and D, as shown using
(8) bolts AA, (8) washer BB, and (8) nut CC. Holes on
rails should be facing to the outside of the workbench top.
• Finger tighten.
CC
BB
Front
Back
Figure 2
3
AA
D
B
Leveler
(on top)
A
Holes
facing out
Tabla de contenido
loading

Tabla de contenido