Kohler STERLING 3190A Serie Guia De Instalacion página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Position the Bottom "C" Frame
Place the bottom "C" frame on the shower base ledge, as illustrated.
Position each end of the bottom "C" frame 1/8" (3 mm) away from the wall and about 1/4" (6 mm)
in from the outside ledge of the shower base.
Mark the ledge with a pencil along the front edge of the bottom "C" frame.
Fasten the frame with masking tape.
1034048-2-B
Bottom "C" Frame Legs
Installed on Base Ledge
Each End
1/8" (3 mm)
from Wall
Front
Level
Bottom "C"
Frame
Shower
4
Sterling
Tabla de contenido
loading

Tabla de contenido