ROSIERES RVM 324 Instrucciones De Empleo E Instalación página 27

Encimeras vitrocerámicas
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

To proceed to the new connection, you must adhere the following instructions.
• Before making the connection, make sure that the installation is protected by a suitable
fuse, see table on next page, and that it is fitted with wires of a large enough section to
supply the appliance normally.
1- Operations to be carried out on the existing connection :
. Turn over the hob, glass side against the work top, taking care to protect the glass.
. Open the cover in the following sequence :
- find the two tabs located on the sides,
- put the blade of a flat screwdriver in front
of each tab, push in and press,
- remove the cover.
. Pull out the supply cord :
- remove the screws retaining the terminal block
which contains the shunt bars and the conductors of the supply cord,
- unscrew the cable clamp to release the power supplying cord.
- Pull out the supply cord.
2- Operations to be carried out to make a new connection :
. Choose the power supply cable in accordance with the recommendations in the table
on next pages 28 or 29.
. Pass the power supply cable into the clamp.
. Strip the end of each conductor of the supply cord on a 10 mm length, by taking in
account the requested length of the cord for the connection to the terminal block.
. According to the installation and with the help of shunt bars which you should have
recovered in the first operation, fix the conductor as shown on the chart.
. Screw the cable clamp and fix the cover.
TERMINAL BLOCK
) Shunts
) x 3
)
)
- 27
Tabla de contenido
loading

Tabla de contenido