◆Install the main body
①Install the Φ10 lifting bolts (4 in total)
②Processing of the ceiling will be different base on different buildings. It should be
consulted with the building renovation staff to get the detailed measures.
◎
Processing of the ceiling: To make sure the ceiling is horizontal and without vibration,
the ceiling racks must be reinforced.
◎ Reinforce the cut part of the ceiling, and reinforce the girders.
③After the main body is well hung, constructing the pipes and wiring is followed. Determine
the pipe leading out direction after selecting the installation location. Especially in the
case of existing ceiling, please pull the refrigerant pipe, drainpipe, cables for indoor and
outdoor units, controlling wire to the connecting position, before hanging the unit.
④The fixing method of lifting bolts
Matching the current structure, set the thread pitch based on the size of this unit as follows.
●Wooden occasions
Put the square bar on the
girders to set the lifting bolts
Square bar
Lifting bolts
●
Original concrete embryo occasions
⑤
Floor installation method
Please use the embedded bolts,
or expandable bolts etc.
●
The material of bolts is high-quality carbon steel (surface with copper plating or other
rust treatment) or stainless steel.
●
Processing of the ceiling will be different base on different buildings. It should be
consulted with the building renovation staff to get the detailed measures.
●
The fixing of lifting bolts are depended on detailed condition, but be sure to fix reliably.
4.Installation guide
●Steel skeleton occasions
Set and directly use the supporting angle steal
Girder
Ceiling
Hanging-lifting bolts
●
Knife-
type inserts
Wall
12
Lifting bolts
Supporting angle steal
New concrete embryo occasions
Sliding inserts
Wedging bolt
Steal
Embedded bolt
(hanging-buried
bolt for pipe)