Swing Assembling
1.Swing arrives in 4pcs tubes,
2.Put the swinging body on the
and 2 hanging ropes, a
floor, and put the 4 Velcro covers
swinging body for assembly.
in the direction of black mat.
4.Put the arched tube like this.
5. Insert the straight tube into the
sleeve; connect
two tubes by small socket to big
socket. Repeat it until all the tubes
connected.
7.Connect the body as an oval
8.Put the screw bolt through the
platform.
Velcro cover
www.costway.com
3.Insert the arched tube with foam
into the sleeve firstly.
6.Repeat step 4 and 5 until all the
tubes are inserted.
Please note that the last
tube inserted should be
the arched one.
9. Insert the screw bolt into the
holes of frame tube. Make sure
the holes are aligned.
4
10.Fix it by washer and nut
11.Use wrench to tighten it.
13.Top looking and appearance
14.Assembly finished, and it is
ready to swing
www.costway.com
12.Cover the Velcro back
15. You can stand up and
grasp the handle and surfing
swing.
5