Connection with central heating system
EN
Cylinder must be fitted with central heating system by pipe unions 3/4". A cut-off valves
must be installed before the pipe unions. A flow rate of heating water must be high
enough to maximise cylinder's efficiency (see technical data table). It concerns the
forced circulation installation (with a central heating water pump).
ZW
ZB
CW
C
PG
ZG
15
PL;DE;EN;ES;FR;-078_f.1165