Framing Instructions - Hog Slat Grower SELECT HSES Manual De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Evaporative Cooling System
ACTUAL HEIGHT OF EVAPORATIVE COOLING PAD MAY VARY
SLIGHTLY, THEREFORE PROPER HEIGHT OF THE SYSTEM
SHOULD BE VERIFIED UTILIZING PADS TO BE INSTALLED
(LUMBER NOT INCLUDED)
Figure 1 above shows the typical installation dimensions for a wall mounted system. Table A provides
appropriate dimensions for varying Pad heights.
Please note that in Concrete Installation the 2"X10" and 2"X4" base boards should be replaced
with a single run of 2"X8" baseboards.
Hog Slat Inc. Newton Grove, NC USA November 2018

Framing Instructions

Figure 1
AIR FLOW MUST PASS THROUGH
SYSTEM IN DIRECTION OF ARROW
ABOVE. FAILURE TO DO SO CAN
RESULTS IN ISSUES DURING
INSTALLATION AND OPERATION
4

Capítulos

Tabla de contenido
loading

Tabla de contenido