BLACK&DECKER Price Pfister 49 Serie Manual Del Usuario página 3

Ocultar thumbs Ver también para Price Pfister 49 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7
7B
7D
7C
7 VALVE BODY ATTACHMENT
Remove Clip (7A) from Valve Body (7B) and save. From above sink, insert Valve Body
(7B) through Mounting Holes (7C). The HOT valve, labeled with Red Tag (7D), should
be positioned to the left side of the spout.
8
8E
8A
8F
8C
8B
8D
8D
8 VALVE BODY INSTALLATION
Before proceeding, Valve Stems (8A) are to be set in the closed position. From
underneath sink, place Square Washer (8B) onto Valve Shank (8C) and tighten loosely
with Mounting Nut (8D). Temporarily place Handle (8E) onto Valve Stem (8A) to make
sure the handle levers are properly aligned to sink. Remove Handle (8E) and tighten
Mounting Nut (8D) until Valve Body (8F) is fi rmly secured to sink.
Do not use Handles (8E) to tighten or to rotate Valve Bodies (8F)!
7B
7A
7B
7C
8E
8A
8F
8C
8B
ENGLISH
9
9E
9B
9D
9 VALVE FLANGE ATTACHMENT
Place Plastic Ring (9A) and Flange (9B) over Valve Body (9C) covering the Valve Body
Washers (9D). Secure by threading the Plastic Nut (9E) onto the Valve Body (9C).
10
10 HANDLE INSTALLATION
Screw Stem Extender (10A) onto the Valve Stem (10B). With Valves in "Closed"
position, attach Handle Hubs (10C) onto Valve Stems (10B) and tighten Set Screws
(10D). Make sure Set Screw (10D) is securely tightened to handle (10C).
3
9E
9A
9C
9D
10C
10D
10A
10B
10B
9B
9A
9C
10C
10A
Tabla de contenido
loading

Tabla de contenido