Thremador UCV30 Instrucciones De Instalación página 11

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

STEP 3
PREPARE DUCT CUTOUTS IN CABINET
A. Refer to Figure 9. Drop a plumb-line from Point "P"
at the center of the rear countertop cutout.
Mark this point on the bottom of the cabinet. Draw
Line AA through this point and parallel to the front
of the cabinet. Through the same point draw Line
BB perpendicular to Line AA.
B . Use Table 4 to layout the necessary cabinet
cutouts for the ductwork. Where a range of
measurements is noted, choose a measurement
that allows best clearance from wall studs, floor
joists, utilities, or other obstructions.
Figure 9
Countertop
Surface
Left Side
Note: Centerlines of
Rectangular Duct Shown
UCV30
UCV36
UCV45
UCV30
UCV36
UCV45
L C
Cabinet Back
F
D
A
C
Adjustable Within Range
H
CABINET CUT -OUT FOR DUCTWORK
INTEGRAL BLOWER VTN600CVA
C
D
7-1/2
6
7-1/2
6
7-1/2
6
REMOTE BLOWER VTR600R OR VTR1000Q
C
D
7-1/4
6
7-1/4
6
7-1/4
6
C. Temporarily set intake and cooktop in place and
attach integral blower (or duct transition fitting if a
remote blower is installed). Refer to steps 6 and 7.
Verify that the duct cutouts as marked will match
the hardware installation. Adjust the duct cutout as
necessary to match hardware installation.
D. Remove temporarily placed hardware and make
cutouts in cabinet.
E . Make all other cabinet modifications needed to
provide proper clearances for drawers or remov-
able shelving.
B
"P"
Point
(Center of Rear Cut-line)
G
Plumb line to
intersection A-A &
B-B
30"
B
E
Cabinet Bottom Shelf
B
TABLE 4
E
F
1/4
15-1/2
1/4
15-1/2
1/4
15-1/2
E
F
-
12-1/4
-
12-1/4
-
12-1/4
Page 10
Right Side
Receptacle
Location
A
G
H
9
-
9
-
9
-
G
H
12-1/4
3
12-1/4
3
12-1/4
3
Tabla de contenido
loading

Este manual también es adecuado para:

Ucv36Ucv45

Tabla de contenido