Specifications
Installation Requirements
The cup warming drawer can be installed in a standard or
flush inset application. Finish the edges of the opening.
They may be visible when the drawer is open.
For standard installations, the face trim overlaps stiles and
rails. Refer to the chart below.
For flush inset installations, a minimum 1/8"
required on all sides. To ensure consistent reveals, each
corner of the opening must be exactly 90°.
An anti-tip block must be installed to prevent the cup
warming drawer from tipping forward when opened.
INSTALLATION REQUIREMENTS
BASE SUPPORT
Cup Warming Drawer
TRIM OVERLAP
Top
Bottom
Sides
COMBINATION INSTALLATION
To install a cup warming drawer below a coffee system,
one opening for both units must be specified. To achieve
the minimum reveal between the units, place the coffee
system support rails on top of the cup warming drawer,
then secure the rails to the sides of the cabinet. Any mate-
rial between the units will increase the horizontal reveal.
Installation of an anti-tip block is not necessary when the
cup warming drawer is installed below a coffee system.
4 | Wolf Customer Care 800.222.7820
Electrical Requirements
Installation must comply with all applicable electrical codes.
Locate the electrical supply as shown in the illustrations
on the following pages. A separate circuit servicing only
this appliance is required. A ground fault circuit interrupter
(GFCI) is not recommended and may cause interruption of
operation.
reveal is
(3)
ELECTRICAL REQUIREMENTS
Electrical Supply
Service
Receptacle
Power Cord
MIN
75 lb
(34 kg)
0"
(0)
0"
(0)
11/16"
(18)
RATING
Rating plate location
PLATE
grounded, 120 VAC, 60 Hz
10 amp dedicated circuit
3-prong grounding-type
3'
(.9 m)