Kohler K-7147 Guia De Instalacion página 8

Ocultar thumbs Ver también para K-7147:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Lift Rod
Loop
Lift Rod
Assembly
6. Install Flush Hood
- Use a pliers to spread the top loop of the lift rod apart. Insert the end
of the loop into the hole in the end of the overflow hood lever. Close
the lift rod loop with a pliers.
- Insert the lift rod assembly, with attached hood, into the overflow
elbow.
- Install the hood by lifting it up and attaching the hood hinge to the
overflow elbow with the screws provided.
- Lift the hood to open the drain. The stopper should lift to
approximately 3/8" (1cm). If it does not, remove the lift rod
assembly.
- If the stopper does not lift high enough, use the adjusting screw to
adjust the spring downward. If the stopper lifts more than 3/8"
(1cm), adjust the spring upward.
7. Installation Checkout
- Ensure that all connections are tight.
- Open the drain.
- Turn on main water supply and check for leaks. Repair as needed.
B
1018154-2-
Hood
Assembly
8
Kohler Co.
Tabla de contenido
loading

Este manual también es adecuado para:

K-7148K-7169

Tabla de contenido