Brandt AX545FXE1 Instalación Y Consejos página 10

Ocultar thumbs Ver también para AX545FXE1:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 18
Contents
Installing your dishwasher ....................................19-25
Levelling by adjusting the feet .......................................19
Noise insulation flap......................................................19
Possibilities for building in or facing ................................20
Water connections ........................................................21
Draining away the waste water ......................................22
Electrical connection .....................................................22-23
Foam strip and soundproofing seal.................................24
Installing the plastic corner brackets ..............................24
Safety instructions .................................................24
Building in under a hob ..........................................24
Dishwasher with built-in hob..................................25
18
Pages
GB
Installing your dishwasher
Remove
the
2
red
protective wedges from the front
of your appliance to avoid causing
a leak.
Levelling by adjusting the feet
Ensure that your dishwasher is well
balanced and stable. The four feet can
be adjusted, so adjust them if necessary
using a screwdriver. If the feet are
poorly adjusted, this decentres the door
and makes your dishwasher wobble,
causing leaks.
For dishwashers that can be built-in,
fitted with rear feet adjustment via two
knurled knobs on the base of the
machine, at the front, use a screwdriver,
without exerting force, to finish the
adjustments to avoid damaging the
worktop.
Noise insulation flap
For better noise insulation, install the
flap supplied with your dishwasher
(depending on the model):
① .
Slightly
tilt
the
dishwasher
backwards to clip the flap onto the base
of the plinth. Ensure that it clips firmly
at three points (each end and the
centre)
② . Adjust the height of the flap by
cutting off one or more strips after
nicking the end with a pair of scissors.
The flap should be in contact with the
floor.
GB
19
Tabla de contenido
loading

Tabla de contenido