Installation Of The Connection Pipe - Gree GKH(12)BB-K6DNA3A El Manual Del Propietario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5.1.4 Leveling
The water level test must be done after installing the indoor unit to make the unit is horizontal,
as shown below.

5.2 Installation of the Connection Pipe

5.2.1 Flare Processing
(1). Cut the connection pipe with the pipe cutter and remove the burrs.
(2). Hold the pipe downward to prevent cuttings from entering the pipe.
(3). Remove the
(4).
DC Inverter Free match Series Cassette Type Unit
Horizontal tester
Fig.8
Fig.9
16
Fig.9
Tabla de contenido
loading

Tabla de contenido