Kohler K-6448 Guia De Instalacion página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Preparation
Verify adequate clearance underneath the cabinet and decide
installation locations for the sink, garbage disposal, control
module, user interface, outlet, and outlet switch.
NOTE: If the user interface is located in direct sunlight, the indicator
lights of the interface may be difficult to see.
Locate the user interface within reach of the sink.
Route the electrical supply and install a switch-controlled
GFCI-protected outlet to the inside cabinet wall near the drain
end of the sink.
Install the outlet switch within sight of the sink (not shown).
1095326-2-A
User
Interface
Sink
Control
Module
4
Kohler Co.
Tabla de contenido
loading

Tabla de contenido