Ups Startup; Service And Support - Eaton Powerware 5125 Guia De Instalacion

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

UPS Startup

Press and hold the On button until you hear the UPS beep
(approximately one second). The
bar graph indicators display the percentage of load being applied to the
UPS.
The UPS is now in Normal mode and supplying power to your
equipment.
NOTE The batteries charge to 90% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 24 hours after installation or long-term
storage.
For additional P33 information, go to
then select your region:
: The Americas (North and South America)
: EMEA (Europe, the Middle East and Africa)
: APAC (Asia Pacific and China)
Click

Service and Support

In the United States and Canada, call
In Europe, the Middle East, and Africa (EMEA); Latin America; or
Asia-Pacific, call the
Please have the following information ready when you call for service:
: Model number
: Serial number
: Version number (if available)
: Date of failure or problem
: Symptoms of failure or problem
: Customer return address and contact information
For information regarding routine maintenance and battery
replacement, refer to "UPS Maintenance" in the Powerware 5125 User's
Guide.
Powerware
5125 Installation Guide for IBM Applications
®
,
, and
Products
9910 Solutions
that services your account.
IBM office
:
164201356 B Uncontrolled Copy

indicator stops flashing and the
www.oem.powerware.com/ibm-ups
.
Powerware pSeries
(1-800-426-7378).
1-800-IBMSERV
Installation
13
Tabla de contenido
loading

Tabla de contenido