Installing Optional Equipment; Power Management Software; Ground Bonding Screw - Eaton Powerware 5125 Guia De Instalacion

Ocultar thumbs Ver también para Powerware 5125:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

6. Attach the front bezel to each unit (supplied in the UPS and

Installing Optional Equipment

This section describes the UPS options that should be installed before
starting up the UPS:

: Power Management Software

: Ground Bonding Screw

: Remote Emergency Power-Off switch
Power Management Software
If you are installing power management software, use one of the
supplied communication cables to connect your computer to Port 1 on
the Multi-Server Module of the UPS.
Refer to the Multi-Server Module User's Guide and the Powerware
Software Suite CD-ROM provided in the accessory kit for more
information.
Ground Bonding Screw
If your rack has conductors for grounding or bonding of ungrounded
metal parts, connect the ground cable (not included) to the ground
bonding screw.
Powerware
5125 Installation Guide for IBM Applications
®
EBM shipping cartons).
UPS
Optional
EBMs
Figure 2. Rack-Mount UPS with EBMs
:
164201356 B Uncontrolled Copy
Installation
5
Tabla de contenido
loading

Tabla de contenido