Electrical Connections - Bauer ARC Manual Para La Instalacion Y La Manutencion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 20
4.

ELECTRICAL CONNECTIONS

GB
The electrical connections and the start-up of the gearmotor
ARCB are shown in the installation manual of the E2 control
panel. To reverse the direction of rotation, exchange the motor
phases.
The electrical connections and the start-up of the gearmotor
ARC1BH are shown in the installation manual of the VIVAH
control panel. To reverse the direction of rotation, exchange
the motor phases.
The electrical connections and the start-up of the gearmotor
ARCBH are shown in the installation manual of the E2H control
panel. To reverse the direction of rotation, exchange the motor
phases.
All right reserved
All data and specifications have been drawn up and checked with the greatest care. The manufacturer cannot however take any
responsibility for eventual errors, ommisions or incomplete data due to technical or illustrative purposes.
ARC - IP1725
5. MAINTENANCE PROGRAM (every 6 months)
Without 230 V~ power supply and batteries if present:
-
Lubricate the levers of the gearmotor.
-
Lubricate the rotation pivot of the gate leaf.
-
Lubricate the gate leaf hinges.
-
Check the good conditions of the electric connection.
-
Check that the fixing screws of the gearmotor are firmly
tightened.
Reconnect the 230 V~ power supply and batteries if present:
-
Check the power adjustment.
-
Check the good operation of all command and safety
functions (photocells).
-
Check the good operation of the release system.
ATTENTION: For spare parts, see the spares price list.
10
Tabla de contenido
loading

Tabla de contenido