Preventative Maintenance Kits; Required Every 12 Months; Maintenance Procedures - Parker BAP015 Guia Del Usuario

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Preventative Maintenance Kits

Required every 12 months

4.2 Maintenance Procedures

The following maintenance procedures should only be performed by competent, trained, qualified personnel and
approved by Parker domnick hunter.
Slowly close the inlet (1) and regulator (2) valves which will depressurise the filter.
1
Description
BAP-PMK15-12
Contents
015AA
015AC (x4)
Seals
Auto drain
2
9
Tabla de contenido
loading

Tabla de contenido