BrassCraft Kt Serie Guia De Inicio Rapido página 2

Llave de paso del suministro de agua
Idiomas disponibles

Idiomas disponibles

INSTALLATION INSTRUCTIONS (CONTINUED)
CPVC INLET
Be sure to shut off water before starting.
CAUTION: USE ONLY CPVC CEMENT OR
AN ALL-PURPOSE CEMENT CONFORMING TO
ASTM F-493 OR JOINT FAILURE MAY RESULT.
CAUTION: ASSEMBLE VALVE ACCORDING
TO SOLVENT WELD MANUFACTURER'S
INSTRUCTIONS.
1. Cut pipe squarely and remove all inside
and outside burrs.
2. Follow solvent weld manufacturer's instructions.
CAUTION: TOO MUCH CEMENT CAN CLOG WATERWAYS AND WEAKEN INSERT IN
FITTING OR VALVE.
Tools Needed for Installation: • CPVC Cleaner/Primer (or fine sandpaper)
• CPVC Cement • Wrench
BARBED PEX INLET
Be sure to shut off water before starting.
For use with ASTM F876 / F877 / F1807 PEX only
CAUTION: ASSEMBLE STOP
ACCORDING TO CRIMP TOOL
MANUFACTURER'S INSTRUCTIONS.
1. Cut PEX tube so the end is
square and round.
2. Slide crimp ring over PEX tube.
3. Insert valve barb inlet into PEX tube
completely until tube stops at
valve body.
4. Position crimp ring over barb area
and follow crimp tool manufacturer's instructions to secure.
Tools Needed for Installation: • Tube Cutter • Crimp Tool • PEX Crimp Gauge
COLD EXPANSION PEX ON INLET
Be sure to shut off water before starting.
For use ASTM F876/F877/F1960 PEX only.
CAUTION: ASSEMBLE STOP
ACCORDING TO PEX COLD EXPANSION
TOOL MANUFACTURER'S
INSTRUCTIONS.
1. Cut PEX tube so that the end is
square and round.
2. Slide the PEX reinforcement ring
over the PEX tube.
3. Follow the PEX cold expansion tool
manufacturer's instructions for
installation of the stop barb inlet.
4. For riser tube installation, see that section.
Tools Needed for Installation: • Tube Cutter • Expansion Tool
PUSH CONNECT INLET
• For use with Copper, PEX and CPVC
• For use with water in exposed locations only.
Be sure to shut off water before starting.
INSTALLATION
1. Cut Copper, PEX or CPVC tube square, round
and free of burrs. If sharp edges are not
removed, connection may leak. Make sure
stub-out length will accommodate depth of
stop and flange.
VALVE SOCKET
Entrada de la llave de paso
CPVC PIPE
Tubo de CPVC
CRIMP RING
BARBED INLET
Anillo de presión
Entrada tipo espiga
PEX TUBE
VALVE
Tubo de PEX
Llave de paso
EXPANSION RING
BARBED INLET
Anillo de expansión
Entrada tipo espiga
PEX TUBE
VALVE
Tubo de PEX
Llave de paso
TO CUT COPPER
TO CUT PEX & CPVC
Al cobre cortado
Al PEX o CPVC cortado
DEPTH MARKING
Mcra de profundidad
TUBE INSERT
Inserto para tubería
PUSH CONNECT INLET (CONTINUED)
2. Mark tube: if G2PC, than mark 1-1/8" from end.
If G2PS, then mark 1" from end. Push valve
onto tube as far as possible, at least to line
marking on tube is reached. Tube insert will
self align in tubing.
REMOVAL
1. With water pressure off and system
depressurized, be sure to remove supply line
and drain any remaining water from tube.
2. Remove locking clip.
3. Position stop firmly in palm as shown.
With two fingers, depress removal flange
back towards stop and pull from tubing.
4. Before re-installing stop, insert locking clip
between removal flange and stop body.
Tools Needed for Installation: • Tube Cutter
• Marker • Measuring Tape
CAUTION:
• FAILURE TO PUSH VALVE TO MARK MAY
RESULT IN A LEAK.
• DO NOT USE ANY PLUMBER'S PUTTY,
PIPE THREAD TAPE, OR OTHER SEALANT TO
CONNECT VALVE.
• IF G2 1/4 TURN VALVE INSTALLATION, DO NOT
SWEAT WITHIN 12 INCHES OF THE VALVE.
• ONLY INSERT COPPER, PEX OR CPVC TUBING
INTO THE VALVE.
• DO NOT ATTEMPT TO REMOVE TUBE SUPPORT.
SLIP-JOINT OUTLET
Be sure to shut off water before starting.
NOTE: Do not use pipe compound on
slip-joint threads.
1. Be sure tube is not flattened
out-of-round and all burrs are
removed. If tube is oval or
out-of-round, do not rely on the nut
to correct. Bring into shape before
tightening nut. Replace tube if it
is grooved, pocked or scarred
as abrasions prevent a good seal.
2. Slide slip-joint nut, friction ring and
cone washer onto tube.
3. Be sure tube is lined up with valve
so it enters straight and "bottoms"
true. If cocked or tilted, nut will not
seat properly and could eventually
develop a leak.
4. Tighten nut, wrench tighten. DO NOT OVERTIGHTEN. Use tape to protect the finish.
5. Turn on main water supply. Turn on valve counterclockwise. If slip-joint nut leaks,
turn off water supply. Back off (loosen) nut completely, realign and retighten.
DO NOT OVERTIGHTEN as this could lead to future failure.
Tools Needed for Installation: • Wrench • Protective tape
• Sandpaper or file (if necessary)
COPPER COMPRESSION OUTLET
Be sure to shut off water before starting.
1. Cut the riser tube to length so it bottoms out in the stop.
2. Place compression nut and sleeve
onto the copper tube.
3. A drop of general purpose oil will
make tightening easier.
TUBE
Tubo
LOCKING CLIP /
Clip de retención
REMOVAL
FLANGE
Campana para remover
G2PC
Depth Marking
Tube Insert
G2PS
SLIP-JOINT NUT
Tuerca de junta
FRICTION RING
deslizable
Anillo de fricción
CONE
WASHER
VALVE OUTLET
Rondana
Salida de la llave
cónica
de paso
VALVE
Llave de paso
loading

Este manual también es adecuado para:

G2 serie