Complete The Installation - Kohler K-4000 Guía De Instalación Y Cuidado

Descarga sin contacto
Ocultar thumbs Ver también para K-4000:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Pad

5. Complete the Installation

IMPORTANT! Wait at least 10 seconds after the last test flush
before installing the tank lid. Hold your hand over the sensor for 1-2
seconds after installing the lid to confirm proper operation.
NOTE: If you are unable to activate the sensor immediately after
installing the tank lid, wait a minimum of 5 minutes for the sensor
to calibrate.
For tank lid stability, install four pads, two on the front (not
shown) and two on the back, near each corner of the tank lid or
tank rim where the lid contacts the tank rim. The pads stabilize
the lid, helping stop false flushes when the lid is bumped.
Install the tank lid.
Hold your hand approximately 1" (25 mm) above the module.
The toilet will flush.
Consult the troubleshooting chart for operation or performance
issues.
Kohler Co.
Pad
Sensor Indicator
Emblem
7
1224637-2-D
Tabla de contenido
loading

Este manual también es adecuado para:

K-6418K-6419K-18202K-99249K-99250

Tabla de contenido