Conduit
Power Lead
Factory Splice
(in thin-set, not
in conduit)
Tape
STEP 3.9
Feed the sensor wire through the sensor
conduit, leaving at least 6"-8" of free lead
length at the control electrical box. Weave the
sensor at least 1' into the mat area, halfway
between the heating wires, and secure it
using hot glue. Do not cross the heating
wires. It may be necessary to chisel a small
section of the subfloor to accommodate the
sensor, depending on the thin-set thickness
being used.
Sensor
Top-Down view of Mat and the sensor entering wall.
15 of 96
Heating Wire
©2015 SunTouch