Kohler K-6350 Guia De Instalacion página 7

Ocultar thumbs Ver también para K-6350:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Installation Checkout
Ensure that all coupling nuts are tight.
Ensure that the lever handle is in the down position.
Remove the sprayhead and screen from the end of the hose.
Position the hose in the sink.
Turn on the main water supply.
Open the valve for one minute to flush the fitting.
Close the valve.
Reattach the sprayhead and screen.
Turn on the water and check for leaks.
Adjust as needed.
Kohler Co.
7
1025490-2-B
Tabla de contenido
loading

Tabla de contenido