READ ALL
INSTRUCTIONS
AND SAFETY
INFORMATION
IMPORTANT!
It is extremely
important you verify
that the heater is
configured for the
correct supply
voltage. If replacing
an existing heater,
check the labels of
the old heater and
configure for the
appropriate voltage.
Hooking a heater
configured for 240
volts to a 120-volt
power supply will
drastically reduce
the heater's output.
Hooking a heater
configured for 120
volts to a 240-volt
power supply will
destroy the heater.
Connecting your
heater to an
incompatible power
supply will void
the warranty
P.2
PLACEMENT:
Install The Com-Pak Bathroom Heater (Model CB) vertically. Heater is not approved for horizontal or
ceiling mount applications.
CONTROLS:
A built-in thermostat and 60 minute timer. (Note: Do not use with a wall thermostat).
How do I install for new construction?
Mount The Wall Can
STEP 1
The CB Series heater REQUIRES A MINIMUM
distance of 6 inches from adjacent surfaces and 4
inches from the floor. However, Cadet RECOMMENDS
12 inches from all adjacent surfaces and 12 inches
above the floor for longer and cleaner performance.
Heaters must be spaced at least 3 feet apart.
Secure the wall can to the stud with 2 screws (See
Figures 1 & 2). As an option, the rubber shim provided
may be attached to side of wall can to square the wall
can to the stud.
Figure 1
Face of wall can must
extend
face of stud to allow for
thickness of sheetrock.
Figure 2
Attach wall can to
stud with screws
through holes
provided in wall can.
Connect Supply Wires
STEP 2
Route the supply wire from circuit breaker to
heater. Remove a knockout and attach the
supply wire with a strain relief connector
leaving 10 inch wire lead for later use. Connect
supply ground wire to grounding pigtail in wall
can (See Figure 3). Proceed to PART TWO.
Installation Instructions
Part One
How do I install in an existing wall?
STEP 1
Cut a hole 8 inches wide by 10
1
/
2
a wall stud. This heater REQUIRES A MINIMUM
distance of 6 inches from adjacent wall surface and
4
1
/
2
RECOMMENDS 12 inches from all adjacent wall
surfaces and 12 inches from the floor (See Figure 4).
1
/
or
5
/
inch from
2
8
Figure 4
Model CB
STEP 2
Route supply wire from circuit breaker directly to heater.
Remove a knockout and attach the supply wire with a
strain relief connector, leaving 10 inch wire lead for later
use (See Figure 3). Connect supply ground wire to
grounding pigtail supplied in wall can.
STEP 3
Insert wall can into opening; keeping wall can flush with
wall surface. Secure can to wall stud with 2 screws
through holes provided in can.
Proceed to PART TWO
Figure 3
Proceed to Part Two
Cut Hole In Wall
1
/
inches high next to
4
inches from the floor. However, Cadet
Connect Supply Wires
Mount The Wall Can