York EKKC 12 D Instrucciones De Instalación página 20

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 7
by johnson controls
After installation test and
check operations
Test operation (Fig. 19)
1. Prior to test:
(1) Do not connect the unit until completely
installed.
(2) Wiring should be correct and safe.
(3) Valves should be open.
(4) The unit should be free of impurities.
2. Test operation method:
(1) Connect the unit and press ON/OFF
button on the remote control unit.
Wiring
ENJC 12, 18, 24, 30, 36, 42 + EKKC 12, 18, 24, 30, 36, 42
OUTDOOR UNIT
12k ----> CN3 outdoor unit / J13 indoor unit
18k - 42k ----> CN66 outdoor unit / J13 indoor unit
ATTENTION
Your product is marked with this symbol. This means that at the end of its service life it should not be mixed
with other non-classified household waste. Therefore, disposal should be carried out in compliance with the
corresponding local and national regulations, in a correct and environment-friendly manner.
The dismantling of the air conditioning unit, as well as the processing of refrigerant, oil and other components,
should be carried out by a qualified technician and in compliance with the applicable legislation.
Contact your local authorities for further information
All data and dimensions are subject to change without prior notice.
20
(2) Press the MODE button to make sure
all three modes are operative:
COOL, HEAT, DEHUMIDIFICATION.
3. Emergency method.
Whenever the remote control unit cannot
be used, proceed as follows:
* With the unit off, press AUTO to
activate. The unit will operate in the
corresponding mode.
* With the unit on, press AUTO to turn
it off.
Note: The TEST mode is for testing
purposes only. Do not use as a regular
operating mode.
INDOOR UNIT
GB
ENJC 36, 42 + EKKC 36, 42
OUTDOOR UNIT
Fig. 19
INDOOR UNIT
Tabla de contenido
loading

Tabla de contenido