Test Run
Attach the terminal box cover.
5
Place the terminal box tabs into the holes and
return the cover to its original position, secure
it with the screw.
1.Attach the drain tank.
6
2.Make sure the air filter is all the way in.
Test Run
Check the voltage of power supply
Turn the ground-fault circuit breaker on
Turn the power switch on
Dry hands
Check the unit
Do not turn the unit power switch on with your hands inside.
If the self-check indicator in the display lights or is flashing, turn the power switch off, and turn the power back on when all
the indicators go off (after 40 seconds).
Step
front panel
installation screw
drain tank
Check
Is single-phase alternating current 210V-250V
used?
Does the power indicator light up?
Is the air blowing?
Is the unit installed firmly? Any vibration or
strange noise?
Result