Making Ready For Winter - Vetus ILTCONW Instrucciones De Instalación Y Manual Del Propietario

Equipo de conexión para depósitos de aguas sucias
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 43
3

Making ready for winter

The tank, pipes, pump, etc. must always be
drained completely.
Never put anti-freeze in the tank or other
parts of the drinking water system to protect
it against freezing, anti-freeze is very poison-
ous!
5
Installation
5 1
General
When choosing a place for the tank and for the
deck filler cap, take the following into account:
­ The suction hose should be as short as pos­
sible, must go directly down to the tank and
be as straight as possible.
­ The space in which the tank is placed should
be properly ventilated.
vetus® Connection kit for waste water tanks
N
ote
4
Maintenance
­ Check the breather nipple regularly and
clean the sieve of the breather nipple if nec­
essary.
­ Check the hoses and hose connections for
possible leaks annually and fit new hoses
and/or hose clamps as necessary.
­ Also check the tank for damage as a result
of chafing. Replace a damaged tank imme­
diately.
­ Carry out the disinfection procedures de­
scribed under 'Use' at the beginning of the
sailing season.
­ A tank and installation that is strongly con­
taminated by algae can be cleaned by rins­
ing the tank, the pump and pipes with a
solution of bleach in water (1:20). Rinse the
tank with clean tap water.
Position the tank in such a way that the
plug P is on the top side of the tank. Con­
sult the diagrams on p. 66­67 for place­
ment of plug P.
ENGLISH
N
ote
15
110141.01
Tabla de contenido
loading

Tabla de contenido