Package Contents; Preparation - LF Utilitech Pro UT58104 Manual De Usario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PACKAGE CONTENTS

Part
Description
Pre-Assembled Pump System
A
(Includes B through H)
B
Basin
C
Pump
D
Check Valve
E
Basin Lid
F
Cord Seal
G
Inlet Cap and Seal
H
Foam Gasket

PREPARATION

Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Installation Time: 2 hours
Tools Required for Assembly (not included): tape measure, pipe tape, hacksaw, flathead screwdriver,
2-step PVC glue system (primer and sealer)
Parts Required For Standard Assembly (not included): 2 in. slip by NPT coupling, 1-1/2 in. slip by
NPT coupling, drain pipe, compression fitting for 1-1/4 in. drain pipe, PVC pipe and fittings as required
to complete installation, additional check valve as required by codes.
Quantity
1
1
1
1
1
1
1
1
A
4
F
E
H
D
C
G
B
Lowes.com

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

0240055

Tabla de contenido