Cable Installation - Preparation - Leviton Opt-X 5R1UD-S12 Instrucciones Para Usar

Caja de fibra optica uhd
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CABLE INSTALLATION - PREPARATION

Top View: Tray to Front
NOTE: Tray in forward position, covers
are removed for clarity.
Pictured: Removable tray to facilitate field
termination
Page 6 of 30
COMMENTS:
• Route cable to tray through grommet on the opposite
side of slide tray tie down point
• Assure cable slack for tray movement.
• Recommended trunk breakout length is 36 inches.
• A minimum of 20 inches of free slack is required to each
cassette for bend radius compliant accessibility from the
front side.
To remove tray from enclosure, slide tray fully forward
stop position. Press release lever and slide tray out to
remove.
Caution - Damage may occur to fiber cabling if tray is removed
beyond the stop point when loaded.
Tray Release
To Remove a tray: (see diagram)
1. Pull the tray forward to the stop point
2. Press the release lever toward the outside of the
enclosure and remove the tray from the tray
guides.
To Install a tray:
A. Insert the tray into the target position
B. Slide the tray inward until the first stop point is
reached.
C. Press the release lever toward the outside of the
enclosure and continue sliding the tray inward to
the fully enclosed position.
DI-000-5RXUD-20A

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Opt-x 5r2ud-s24Opt-x 5r4ud-s48

Tabla de contenido