SilverBack B5404W Manual Del Usario página 8

Sistema de basquetbol
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

IMPORTANT! BE SURE CONCRETE HAS BEEN
ALLOWED TO CURE FOR AT LEAST 2 DAYS.
13. Attach post Ears (#30) to holes near the bottom of top
post (#3) using two hex bolts (#25) four washers (#18)
two lock nuts (#4)
and two plastic nut caps (#10)
See
Figure 6
&
Detail 2
13
14
15
21
20
16
20
ASSEMBLY INSTRUCTIONS (Day 3)
.
.
1
3
Figure 7
14. Slide actuator sleeve (#15) over actuator (#16) and place
19
Note: If necessary, use a rubber mallet to tap in
15.
10
4
actuator cap (#13) on top. slide pivot tube (#14) through hole
near top of both the
amounts stick out through both sides of actuator. See
Pivot Tube (#14)
Slide tab on actuator (#16) between post Ears (#30) and
Secure using one bolt (#19), two washers (#20) and one
lock nut(#21). See
Figure 7
16. place pole cap (#1) onto top of top pole (#3).
Note: Pole cap may be pre-installed by the factory.
8
Figure 6
3
18
18
25
30
30
Detail 2
Actuator & Actuator Sleeve
. Tighten bolts tight.
3
12
2
until equal
Figure 7
.
Tabla de contenido
loading

Este manual también es adecuado para:

B5404f

Tabla de contenido